Managed to get a Hurri off the ground in ATAG......

…took around 15 minutes of turning the engine to get the oil temp over 20. That was enough to allow the engine to catch properly. Then 5-10 minutes warming it up.
Took it on the runway, full power and then blew the engine I forgot to open my rad!!!

Brilliant :rolleyes: